Both Front Doors Installed


Both Lesmeister Guesthouse front doors are now installed, and they have cut holes in them and installed temporary locks, so there’s no turning back now! They also have done quite a bit of the framing for the front windows so they’ll soon be able to measure and order the big glass windows to seal up the front of the building.

Inside, they’re running fans all day to circulate the air so the drywall joint compound will dry faster. Counter Top Concepts of Pocahontas is busy building the kitchen cabinetry.

Leave a Reply