Electrician Sighting at the Lesmeister


The plumbers have finished their first phase of work at the Lesmeister Guesthouse, with all the underground drain pipes laid and covered. Today gray electrical conduit appeared as the electricians came by to do their underground work. These conduits lie above the plumbing but will be below the concrete floor slab, which will probably be poured soon. It’s nice to see progress taking place every day now.

Gray electrical conduit will bring underground electricity into the building and distribute it throughout the building.

Leave a Reply